POPULAR QUESTIONS
Frequently asked questions from support
BATHROOM
Wet Wall Panels are a type of waterproof cladding installed as an alternative to tiles. They are most commonly found in bathrooms but they can be fitted anywhere that tiles can be fitted.
Wet wall panels are a fast way to renovate your bathroom. Due to the ease of fitting, complete small bathroom makeover can be done within 2,5-3 days, compared to tiled bathrooms which can take even few weeks. Wet wall is easy to keep clean due to the lack of grouting, which is a necessity with tiling. Wet wall is also a low-maintenance and hygienic choice, less likely to cause a bad odour or growth of mould in the bathroom.
Typically, it takes around 3 days to remodel an average-sized bathroom. This means less disruption to your daily routine and faster transformation of your bathroom space.
You can simply clean your walls with just a soft, non-abrasive cloth and a bowl of soapy water. Just soak the area in soapy water for two to five minutes and then carefully wash it clean if you see any stain build up.
Bleach can damage the finish of PVC, so we recommend using a bathroom cleaner that doesn’t contain bleach.
Yes! There is no need to remove old tiles before installing PVC wall panels – this means no plastering, no mess, and no fuss.
KITCHENS
We will rip out your old kitchen including units, worktops etc. and removing appliances. Fitting new kitchen units and worktops. Also fitting new kitchen sink, taps and appliances. We cooperate with a certified gas engineer and electrician who can install everything for you with care.
Sure, we can only replaced your kitchen doors! This would help you to transform your old kitchen at an affordable price.
We supply and fit it- we cooperate with kitchens units door supplier.
You should physically clear the space, removing everything from cupboards, shelves and countertops. Also move any furniture to keep it safe and protected.
The time it takes to fit a kitchen depends on various factors such as the size of the kitchen, and the type of kitchen being installed. On average, a typical kitchen fitting project takes between one to two weeks to complete. However, this can vary depending on the scope of work involved.
- For kitchens units door replacement only, we need few days to complete.
OTHER
We usually start our day at 8am, and finish at 4pm. The times may change due to different circumstances, for example, if we have very few things left to complete a project, then we usually stay longer to finish it on that day.
Yes we do, if you wish to do so. After we complete a project we take waste away (old bathrooms/ kitchen units etc.) so you are left with no mess.
Bank transfers and cash.
We require small deposit to secure your slot. It’s usually around £100-£300 depending on how big the project is.
For kitchens units door projects, we require payment upfront for source materials